WFW wins five Airfinance Journal 2021 awards
The Airfinance Journal Awards celebrate the best-in-class airline, lessor and OEM financings to have closed in the past calendar year.
The Airfinance Journal Awards celebrate the best-in-class airline, lessor and OEM financings to have closed in the past calendar year.
Bioenergy Serre and Bioenergy Albanella each owns a project to build an anaerobic digestion plant dedicated to the production of biomethane and high-quality compost.
Matrix Renewables’ portfolio currently comprises 2.1 GW of operational, under construction or near ready-to-build solar PV projects.
The financing, which has a maximum maturity term of 15 years, is the largest ECA-backed green loan Iberdrola has ever signed.
The barge will be a great asset to Portsmouth’s Naval Base with its arrival meaning that smaller vessels will no longer need to enter the base’s frigate and destroyer docks during maintenance.
WFW has been involved with the Beleolico project since its inception in 2011, assisting Belenergia on due diligence phase and on the administrative aspects of the financing.
The new promotions bring the total number of partners to 173.
Built in 2010, Thor is a dynamic positioning (DP2) jack-up crane vessel ideal for maintenance projects at offshore wind plants and for wind turbine installations.
The project, led by Swedish energy company Vattenfall is expected to become fully operational in 2023 and is the first non-subsidised wind farm project in the Netherlands.
X-ELIO is a global leader in the development of sustainable energy with a strong commitment to the reduction of greenhouse emissions and the fight against climate change.
Please wait while you are redirected to the right page...