WFW advises Encavis on Danish solar parks acquisition and €32m financing
The loan ends on 30 June 2040 and was arranged and structured internally by Encavis.
The loan ends on 30 June 2040 and was arranged and structured internally by Encavis.
The electricity will be supplied by the 169 MWp Olmedilla and 155.2 MWp Sabinar I projects.
More about us