Power to the Ports – Overcoming Grid Constraints 17 November 2026

Unlocking Port Growth Through Alternative Power Solutions

Electricity demand is expected to more than double by 2050 as sectors across the economy, including hydrogen production, manufacturing, transport, housing, and data centres, increasingly electrify. As ports become more critical hubs in the energy transition, grid constraints are a growing barrier to port/maritime electrification. Ports must compete with these sectors, in particular concerning planned areas to accelerate grid capacity. Beyond their traditional role as gateways for trade and logistics, ports are increasingly hosting offshore wind operations, hydrogen production, battery storage facilities, shore power infrastructure, electrified cargo handling equipment and industrial decarbonisation projects. As electricity demand at ports grows rapidly, securing timely access to the electricity network has become a major challenge.

With grid connection queues extending well into the 2030s in many regions, ports are exploring alternative approaches to access network capacity and accelerate development. These solutions range from private wire arrangements and flexible connections to local energy systems and co-located generation assets.

The Growing Power Challenge

Port electricity demand is increasing due to several converging factors:

  • the UK Emissions Trading Scheme’s (“UK ETS”) recent expansion to include the maritime sector from 1 July 2026 and the International Maritime Organization’s (“IMO”) GHG reduction 2030 target;
  • planned domestic fuel regulations to drive down GHG emissions will incentivise the electrification of vessels/use of biofuels;
  • the electrification of cranes, vehicles and cargo handling equipment;
  • shore power for vessels at berth and demand for vessel battery charging to enable at-sea operation;
  • the expansion of logistics, manufacturing and data centre activities within port estates; and
  • electric vehicle charging infrastructure.

According to the recent DfT call for evidence outcome, respondents stated that energy capacity needed to increase by two to ten times.

For example, in 2024 the Port of Dover noted that it had a capacity of 8 MW. The potential electric need for cruise ships to shore power was between 7 – 15 MW per ship, with up to three ships alongside at any one time. At Dover there is also an actual and potential need for ferries to recharge and turn around in 45 minutes, with each ferry requiring 25 – 35 MW. This means that the peak electricity demand at Dover could be 160 MW, a far cry from the 8 MW currently available.

Many ports find that increasing their distribution or transmission grid capacity connection can take years due to network constraints, as is presently the case in Dover. The issue is particularly acute in industrial clusters where multiple energy-intensive developments are competing for limited network capacity.

For ports competing internationally for investment, delayed grid access can result in lost economic opportunities and slower decarbonisation progress.

We are aware that certain ferry companies, who were wishing to electrify their vessels, have instead opted for hybrid biofuel vessels due to the lack of grid capacity at their local port and/or battery technology which is waiting for grid supply to catch up.

It is vital that ports appear in the localised energy plans to prioritise grid capacity acceleration.

"It is vital that ports appear in the localised energy plans to prioritise grid capacity acceleration."

Alternative Access Models

Below are some different models/initiatives that can try to circumvent or lessen the impact of delays to an increase in grid capacity at a port.

  1. Flexible or Non-Firm Grid Connections

A flexible grid connection (as opposed to a firm connection) allows a port to increase their grid connection capacity sooner by accepting restrictions during periods of network congestion.

Under this model:

  • the port receives a connection before network reinforcement is completed;
  • network operators curtail demand or generation under specific conditions; and
  • the port benefits from reduced waiting times and potentially lower connection costs.

For ports with diversified energy assets such as batteries or on-site generation, flexible connections can provide a practical bridge solution until permanent network upgrades are delivered.

The challenge is where the port tenant/user requires a guaranteed 24-hour supply of electricity and there are no batteries or baseload generators on-site/available.

  1. Co-Located Renewable Generation

Ports possess significant land and waterfront assets that can support renewable energy developments.

Potential technologies include:

  • rooftop/floating/ground-mounted solar;
  • ground-mounted/roof-mounted onshore wind technology;
  • fixed or floating offshore wind technology;
  • waste-to-energy facilities;
  • tidal/wave facilities; and
  • Nuclear Small Modular Reactors/Floating Nuclear Power Projects.

Combining renewable generation with battery storage can reduce peak import requirements and improve the viability of flexible connection arrangements. There is also the opportunity to generate revenue through the export of power to the grid from the local generation assets during peak times.

Examples include the rollout of a solar rooftop programme at Portsmouth International Port and the MVV EfW CHP facility supplying Devonport.

  1. Private Wire Networks

Private wire arrangements connect electricity generation directly to port facilities without using the public grid network. We regularly see this in a number of ports around the country.

Typical examples include:

  • offshore wind farms supplying adjacent port operations;
  • solar and battery installations within port boundaries; and
  • industrial customers connected through a private wire network.

Benefits include:

  • reduced exposure to network constraints;
  • reduced costs as not subject to network charges and supplier levies (as such arrangements are electricity supply licence exempt);
  • greater control over energy supply; and
  • improved resilience and price certainty.

However, private wire solutions rarely eliminate the need for a wider grid connection altogether, particularly where round-the-clock operations are required. The intermittent output of solar and wind farms will not match the consumption profile of the relevant port users. Batteries may be able to store the generating facility’s output to discharge when required by the relevant port user, however, this will only be on a short-term basis, such as two or four hours. Longer duration batteries are being developed, which, once in play, will shift the dial considerably in this respect.

An alternative being used for data centres is the rollout of gas engine generator sets producing electricity using natural gas, biomethane or hydrogen. The advantage is that these are 24-hour baseload generators. The challenge is the supply of the relevant gas, unless there is an onsite supply, such as an Anaerobic Digestion (AD)/pyrolysis facility.

Care must be taken as to how such private networks are structured to ensure that they remain electricity supply licence exempt. It should also be noted that such networks are also subject to Third Party Access (“TPA”) regulations.

  1. Local Energy Systems and Microgrids

A microgrid enables multiple port users to share generation, storage and demand side response resources.

Such systems can:

  • balance demand across multiple facilities;
  • optimise use of local generation;
  • maintain critical operations during wider network disruptions;
  • give demand side flexibility; and
  • support phased electrification strategies.

A system combining gas/hydrogen turbines and/or batteries can be designed to operate flexibly, responding to network conditions and renewable generation availability.

There is also the opportunity to generate revenue through demand side response activities and exports of power to the grid from the local generation assets.

  1. Commercial/financing models

There are several different models that can be used for the installation of private wire local generation assets. Any of the relevant stakeholders, being the port, an independent power developer or the relevant port tenant/user(s) can finance and install the generation facility (subject to having the relevant property rights to do so).

Power purchase agreement

If the port or an independent power developer does so, they would then enter into a power purchase agreement (“PPA”) with the relevant port tenant/user(s), the PPA being a long-term agreement for the sale of electricity to the end user at usually a fixed price (subject to indexation).

If there is surplus power from the PPA (namely more power than is required by the user/offtaker), then the surplus can be: (a) exported to the same user/offtaker at another site (on a licence exempt basis or under a sleeving arrangement); (b) sold to other port tenants/users; and/or (c) exported to the grid to be sold on the wholesale market. More innovative models will include the parties sharing any additional revenue streams relating to export to the grid at peak times and/or demand side response activities.

Renewable energy certificates (so-called Renewable Energy Guarantees of Origin (“REGO”)) have a value as they are used just by corporates to evidence the reduction/offset of their carbon footprint. Accordingly, where the generating facility supply to a port user is a renewable energy facility, then the PPA must record which party (being either the generator or the offtaker) has rights to the relevant renewable energy certificates.

Who pays for new electrical infrastructure?

Ports will no doubt be cognisant of appearing as attractive as possible. Although we have seen numerous ports invest in renewable energy power, the direct commercial benefits of investment in power infrastructure are often more readily realised by port users than by the port authority itself. Large users such as cruise operators, ferry companies, data centre operators and industrial tenants may be willing to finance dedicated power infrastructure or enter into long-term PPAs.

Whilst all the different stakeholders will be concerned about the reputational aspects of their carbon footprints, cruise operators will be particularly focussed on passenger experience. The reputational and ESG value is more tangible in cruise than for many cargo trades and cruise operators have the backing of the ECAs who will also have their own ESG requirements. Cruise operators having predictable port calls, substantial energy requirements and increasing focus on environmental credentials, can provide the long-term demand profile necessary to underpin investment in new power infrastructure.

As witnessed in other sectors, as power generation facilities are not part of the core business of the maritime sector, we would envisage that third-party power developers are more likely to fund these projects in return for long-term PPAs. However, it is key that the ports are engaged and supportive as they will need to provide the necessary property rights, not only for the generating facility but also the associated cabling routes and charging infrastructure/substations.

  1. Regulatory Considerations

Alternative models require careful consideration of the electricity regulations to ensure that any private wire networks remain licence exempt. As a result of being licence exempt, grid charges and licensed supplier levies are not applicable thereby creating a large saving under any PPA, ranging up to 7 p/kWh.

As noted previously, private wire networks are subject to the Third Party Access (“TPA”) regulations.

"The traditional assumption that infrastructure projects can secure a conventional firm grid connection is becoming increasingly challenged."

Strategic Implications for Ports

The traditional assumption that infrastructure projects can secure a conventional firm grid connection is becoming increasingly challenged. Forward-looking ports are instead adopting a portfolio approach to energy access, combining flexible grid connections with renewable generation, storage, flexibility and private energy infrastructure.

Ports that successfully integrate these solutions are likely to:

  • accelerate decarbonisation programmes;
  • attract clean energy investment;
  • enable offshore wind and hydrogen developments;
  • improve operational resilience; and
  • strengthen their competitiveness both within the energy transition and generally.

Ports will be very keen to attract traffic and investments and offer the following amenities:

  • true compatibility for electric ferries;
  • link-ups for shore-powered cruise business;
  • hydrogen/ammonia bunkering; and
  • e-fuel production.

Access to electrical capacity and being part of so-called ‘green corridors’ is increasingly becoming a competitive differentiator between ports. Shipping lines, ferry operators and industrial users making long-term investment decisions will naturally gravitate towards ports capable of supporting future fuel and electrification requirements.

< Back to insights hub

"As the energy transition accelerates, the ports that succeed will be those that view electricity infrastructure not simply as a utility service but as a strategic asset underpinning future growth, resilience and competitiveness."

Conclusion

Grid access has become one of the defining infrastructure challenges in terms of providing power to ports. Whilst conventional network connections remain essential, the growing scarcity of capacity means ports must increasingly consider alternative access arrangements. Flexible connections, private wire networks, microgrids, on-site generation and shared infrastructure models can all play a role in unlocking development, whilst supporting wider decarbonisation objectives.

Twenty years ago a port director worried about:

  • berth availability;
  • dredging;
  • road congestion; and
  • rail capacity.

In the future they may worry equally about:

  • grid capacity;
  • available MW;
  • energy resilience; and
  • alternative fuel infrastructure.

As the energy transition accelerates, the ports that succeed will be those that view electricity infrastructure not simply as a utility service but as a strategic asset underpinning future growth, resilience and competitiveness.