Unlocking Port Growth Through Alternative Power Solutions
Electricity demand is expected to more than double by 2050 as sectors across the economy, including hydrogen production, manufacturing, transport, housing, and data centres, increasingly electrify. As ports become more critical hubs in the energy transition, grid constraints are a growing barrier to port/maritime electrification. Ports must compete with these sectors, in particular concerning planned areas to accelerate grid capacity. Beyond their traditional role as gateways for trade and logistics, ports are increasingly hosting offshore wind operations, hydrogen production, battery storage facilities, shore power infrastructure, electrified cargo handling equipment and industrial decarbonisation projects. As electricity demand at ports grows rapidly, securing timely access to the electricity network has become a major challenge.
With grid connection queues extending well into the 2030s in many regions, ports are exploring alternative approaches to access network capacity and accelerate development. These solutions range from private wire arrangements and flexible connections to local energy systems and co-located generation assets.
The Growing Power Challenge
Port electricity demand is increasing due to several converging factors:
- the UK Emissions Trading Scheme’s (“UK ETS”) recent expansion to include the maritime sector from 1 July 2026 and the International Maritime Organization’s (“IMO”) GHG reduction 2030 target;
- planned domestic fuel regulations to drive down GHG emissions will incentivise the electrification of vessels/use of biofuels;
- the electrification of cranes, vehicles and cargo handling equipment;
- shore power for vessels at berth and demand for vessel battery charging to enable at-sea operation;
- the expansion of logistics, manufacturing and data centre activities within port estates; and
- electric vehicle charging infrastructure.
According to the recent DfT call for evidence outcome, respondents stated that energy capacity needed to increase by two to ten times.
For example, in 2024 the Port of Dover noted that it had a capacity of 8 MW. The potential electric need for cruise ships to shore power was between 7 – 15 MW per ship, with up to three ships alongside at any one time. At Dover there is also an actual and potential need for ferries to recharge and turn around in 45 minutes, with each ferry requiring 25 – 35 MW. This means that the peak electricity demand at Dover could be 160 MW, a far cry from the 8 MW currently available.
Many ports find that increasing their distribution or transmission grid capacity connection can take years due to network constraints, as is presently the case in Dover. The issue is particularly acute in industrial clusters where multiple energy-intensive developments are competing for limited network capacity.
For ports competing internationally for investment, delayed grid access can result in lost economic opportunities and slower decarbonisation progress.
We are aware that certain ferry companies, who were wishing to electrify their vessels, have instead opted for hybrid biofuel vessels due to the lack of grid capacity at their local port and/or battery technology which is waiting for grid supply to catch up.
It is vital that ports appear in the localised energy plans to prioritise grid capacity acceleration.